Production Planning
Scheduling manufacturing processes.
Workflow
- 01Sales Forecasting
- 02Production Scheduling
- 03Work Order Release
- 04Production Monitoring
If you change this
It implies 3 topics across 2 modules, including Supply Chain Management which you might not expect.
See the path ahead →Why it matters in an ERP context
Planning inside the ERP gives real-time visibility into operations, which is what makes decisions defensible and responses to demand quick. Planned outside it — in a spreadsheet beside the system — the plan and the stock position drift apart within days.
The workflow
- 01
Demand forecasting
Estimate future demand from historical data and predictive analysis.
- 02
Material requirements planning
Determine the materials and components needed to meet the schedule.
- 03
Capacity planning
Assess the production capacity needed to hit the goals in the timeframe available.
- 04
Scheduling
Schedule production tasks in detail against available resources and constraints.
- 05
Execution
Initiate and monitor production, holding to schedule and specification.
- 06
Review and adjustment
Evaluate performance against plan and adjust schedules, capacity or material plans.
The review step is the one most often skipped, and it is the one that makes the next forecast better. A plan nobody reviews is a guess that repeats.
What you need in place
- Demand management: Capturing and analysing demand signals to build forecasts worth acting on.
- Resource allocation: Assigning machines, labour and lines to production optimally rather than by habit.
- Production order management: Creating and managing production orders.
- Product data management: Products defined, including structures, components and the bill of materials.
- Resource master data: Machine, labour and production line information held as data.
- Inventory parameters: Stock levels, safety stock and reorder points set deliberately.
Implementing it
- 01
Define objectives
Identify what the module is for — shorter lead times, lower inventory cost, or both.
- 02
Process mapping
Document current production processes to find the gaps worth closing.
- 03
Configuration
Tailor the system to the planning approach and integrate it with existing workflows.
- 04
Data migration
Move product, inventory and resource data across.
- 05
Training and testing
Train staff and test that planning behaves as intended.
- 06
Go-live and monitoring
Launch, watch performance closely, and adjust.
Questions to ask
01Scale
Can the system scale with the business?
Test against realistic order and SKU volumes, not the demo dataset.
02Integration
How well does planning integrate with the rest of the ERP and external systems?
Confirm it reads live inventory and capacity.
03Customisation
What customisation is available for our requirements?
Separate configuration from code before committing.
04Support
What support and training is offered?
Pin down what is included and what is billable.
Metrics and KPIs to track
Production efficiency
Actual output against standard output for the period.
Order fulfilment time
Time from order placement to delivery.
Inventory levels
Raw materials, work-in-progress and finished goods held.
Quality rate
Share of products meeting quality standards.
Alongside this