Product Lifecycle Management
Managing product development from inception to discontinuation.
Workflow
- 01Concept Development
- 02Design Engineering
- 03Prototype Testing
- 04Product Launch
Why it matters
The handover from design to production is where most product cost is locked in and most version confusion begins. A change approved in engineering that never reaches the shop floor is a defect that will be found by a customer.
- Design decisions determine cost: Most of a product's cost is committed before anything is made.
- Version control is a safety matter: Building to a superseded revision is a recall waiting to happen.
- Compliance evidence lives here: Certification and regulatory approval attach to a specific revision.
The workflow
- 01
Concept development
Need, market and feasibility assessed before design effort is committed.
- 02
Design engineering
Product designed, with the bill of materials and specifications built as the design artefact.
- 03
Prototype testing
Validated against requirement, with results recorded against the revision.
- 04
Product launch
Released to production with the BOM, routing, costing and documentation complete.
Engineering change is the whole problem. Decide how a change reaches production, what happens to stock built to the old revision, and who approves the cut-in point — before the first change, not during it.
What you need in place
- Revision control on the bill of materials: With an effective date and a cut-in rule.
- An engineering change process: Assessed for stock, cost, tooling and compliance impact.
- A single source for specifications: Engineering and production reading the same document.
- Costing at design: So the margin is known before commitment, not after launch.
- Compliance records by revision: Certification is not transferable between revisions.
- End-of-life planning: Run-out of stock, spares obligation and service commitment.
Questions to ask
01Revision
Does production build to the current approved revision?
Verify rather than assume; the gap is common.
02Change
How does an engineering change reach the shop floor?
The answer is often email.
03Stock impact
What happens to stock built to the old revision?
Decide before the change, not after.
04Costing
Is product cost known at design?
Costing at launch is costing too late to act.
05Compliance
Which revision is certified?
Certification does not follow the product automatically.
06End of life
What is our spares obligation after discontinuation?
It is usually contractual and usually forgotten.
Metrics and KPIs to track
Time to market
Concept to launch, by product.
Engineering change volume
Post-launch changes, which indicate design maturity.
Change implementation lag
Approval to production effectivity.
Cost at launch against target
Design-stage estimate to actual.
Revision compliance
Production orders built to the current revision.
Alongside this