Functional Module Implementation

Functional module implementation is the per-module path from design to production: configuration, build, test, data and readiness, done to the same definition of done across every module. Modules that implement to different standards fail integration testing in each other's gaps.

If you change this

It implies 6 topics across 3 modules, including Data & Analytics and Integration which you might not expect.

See the path ahead →

Why it matters

Each module can be delivered competently and the programme still fail, because the gaps are between modules. A consistent implementation path is what makes the modules join.

  • It makes readiness comparable: The same gates for every module, so status means the same thing across the programme.
  • It exposes cross-module dependency early: Design decisions in one module land in another's build.
  • It defines done: Configured is not tested; tested is not ready.

The workflow

  1. 01

    Design

    Process design against the product's standard behaviour, with variations justified.

  2. 02

    Configure

    Built in a controlled environment, with configuration documented as it is set.

  3. 03

    Build

    Extensions and interfaces to the development standard.

  4. 04

    Unit and string test

    The module works internally, including its exception paths.

  5. 05

    Integration test

    The module works with the ones it exchanges data with — the real gate.

  6. 06

    User acceptance

    The business runs its own scenarios and accepts.

  7. 07

    Readiness

    Data, access, training, support model and cutover tasks complete.

Integration testing is not the last phase of module testing; it is the first phase of programme testing. Schedule it as a programme activity with its own environment, data and defect process, or every module will declare itself ready and the programme will not be.

What you need in place

  • One definition of done: Applied identically across modules.
  • Configuration documented as built: Reconstructing it later costs more than recording it now.
  • A cross-module dependency map: Which design decisions affect other modules.
  • Integration test scenarios owned by the programme: Not by each module.
  • Business acceptance by real users: Running their own work, not a scripted demonstration.
  • Readiness criteria beyond the system: Data, access, training and support.

Questions to ask

01Definition of done

Is it the same for every module?

If not, comparing status across modules is meaningless.

02Integration

Who owns end-to-end test scenarios?

If no one, they will be built from each module's optimistic view.

03Standard

How much of this module is standard configuration?

The answer predicts the upgrade cost for the next decade.

04Acceptance

Who from the business accepts, and on what?

Acceptance by the project team is not acceptance.

05Readiness

Beyond the system, what has to be true?

Data, access, training and support are usually the late items.

Metrics and KPIs to track

Configuration completeness

Design decisions configured and documented.

Test pass rate

By cycle, unit through integration through acceptance.

Open defects by severity

Against the gate criteria for the next phase.

Cross-module defects

Defects whose cause is in a different module.

Readiness by criterion

Per module, at each gate.